A small, warm, quiet house in Bellambi
We're Alex and Sarah. We're renovating our family home, a 1975 brick-veneer house in Bellambi on the NSW Illawarra coast. This page sets out what we're trying to achieve, so builders, draftspeople, trades and friends can see the plan at a glance. We'll add designs, specs and Q&A for trades as they come together.
Where we're up to (November 2026)
- We've stepped back from a knockdown-rebuild. The existing house already has most of the space we need; it's facing the wrong way and it's cold.
- We have a concept design for the renovation. Next comes itemised builder pricing, then approvals.
- We plan to live on site during the works, so staging matters.
Our ambitions
-
Turn the house to face the sun
Move living, dining and kitchen to the north side and open them to the garden with double doors. Bedrooms move to the quieter south side.
-
Passive House principles, without certification
Airtightness, checked with a blower-door test before and after (target 5 ACH50 or better, stretch goal 3). R6+ ceiling and R2.5+ underfloor insulation. Double-glazed uPVC windows, heat-recovery ventilation, and external shading to the north and west.
-
All-electric
Induction cooking and the gas disconnected. Plan for rooftop solar, a home battery and EV charging.
-
Enough, not more
Work with what's there: the suspended timber floor, brick-veneer walls and existing footings. Add very little floor area. Use standard sizes and a flat-pack kitchen and wardrobes, and reuse brick and timber from walls that come out.
-
Fix the basics properly
Subfloor ventilation and drainage, plumbing and stormwater connections, termite protection and the roof flashing. An asbestos survey comes before any demolition.
-
Easy to live in
A single mudroom entry, a bike store, and ramps up to a floor that sits about half a metre above the ground. Solid, quiet floors, sound insulation between the bedrooms and living areas, and surfaces that are easy to clean.
-
Flood-aware
The block is mostly in a low flood-risk area. Any new floor goes at or above the flood planning level, services sit up high, and materials low down are flood-compatible.
-
Leave room for later
Don't rule out a possible second dwelling at the back in future. Detail the east side so it can be upgraded later.
How we'd like to work
- Itemised pricing in priority order: must-haves first, nice-to-haves priced separately.
- Works staged so we can keep living here, with a working bathroom and somewhere to cook at every stage.
- Room for us to do some of the work ourselves (demolition, painting, kitchen install, landscaping) where that suits the build.
- Honest early advice on the roof: re-sheet it, raise part of it, or change it.
What we're looking for now
- Illawarra builders keen to price an itemised renovation of a 1970s house to a high-performance standard.
- Advice on approvals (DA or CDC) and on how to stage the work.
Contact
Email fortygleeson@outlook.com.
We're happy to share drawings and arrange a site visit with builders and designers who are interested.